Skip to product information
1 of 7

Easy-Going Outdoor Patio Curtains Detachable Tab Top Windproof Weatherproof Curtain for Cabana, Porch, Pergola and Gazebo, Tab Bottom Drape, 2 Panels, 110W x 84L inch, Teal

Easy-Going Outdoor Patio Curtains Detachable Tab Top Windproof Weatherproof Curtain for Cabana, Porch, Pergola and Gazebo, Tab Bottom Drape, 2 Panels, 110W x 84L inch, Teal

Regular price $82.48 USD
Regular price Sale price $82.48 USD
Sale Sold out
Shipping calculated at checkout.

About This

  • Tab Top & Bottom: Constructed with detachable tab top, which makes the curtains to be moved around and hung with ease. The bottom tabs make the curtain fixed enough that it won't be blown by the wind. It provides protection against rain, snow, heavy wind and other harsh weather element.
  • Multiple Options: Come in a range of colors and sizes to match the decoration of your outdoor space. Each package includes 2 panels of outdoor curtains, each measures width 110 inch by length 84 inch.
  • High Quality Material: 100% polyester fabric with waterproof processing technology, is also able to block out sunlight and UV ray. It is efficient in noise reducing, insulating against heat.
  • Widely Used: Perfect for both indoor and outdoor spaces. These outdoor curtains provide great privacy and safety for your porch, pool, balcony, gazebo, patio pergola, garden, bathroom or indoor rooms.
  • Easy to Care: The curtains are machine washable in cold water, please do not bleach, tumble dry and iron at low temperature.

Overview

  • Brand : Easy-Going
  • Color : Teal
  • Material : Polyester
  • Product Dimensions : 84"L x 110"W
  • Opacity : 85

Product features

Materials and care

Merchandising tips

View full details
Your cart
Product Product subtotal Quantity Price Product subtotal
Easy-Going Outdoor Patio Curtains Detachable Tab Top Windproof Weatherproof Curtain for Cabana, Porch, Pergola and Gazebo, Tab Bottom Drape, 2 Panels, 110W x 84L inch, Teal
Easy-Going Outdoor Patio Curtains Detachable Tab Top Windproof Weatherproof Curtain for Cabana, Porch, Pergola and Gazebo, Tab Bottom Drape, 2 Panels, 110W x 84L inch, TealB0CKV4ZM4F
Easy-Going Outdoor Patio Curtains Detachable Tab Top Windproof Weatherproof Curtain for Cabana, Porch, Pergola and Gazebo, Tab Bottom Drape, 2 Panels, 110W x 84L inch, TealB0CKV4ZM4F
$82.48/ea
$0.00
$82.48/ea $0.00